What should the working drawing record?

Illustrative example. Replace the prompts with approved project data and identify unresolved items for the responsible discipline.

Generator enclosure review matrix
TopicInput or evidenceReview owner
FlowRequired airflow and operating conditionGenset data
OpeningGross size and free areaLouver data
RestrictionPressure drop at the design pointSupplier curve
WeatherRain, insect and environmental controlsProject brief

What does the source support?

The Cummins application manual treats ventilation as a system of air supply and heat and fume removal. A gross opening area alone does not prove performance.

Sources: Cummins: Application Manual: Liquid Cooled Generator Sets, ventilation chapter

What remains an engineering decision?

Cooling, acoustic, structural, fire, fuel and electrical compliance require qualified project review. Only the registered engineer responsible for the job performs engineering sign-off.

Common questions

What else should the bid team know?

Does this guide approve an enclosure design?

No. It is a coordination framework for approved inputs and specialist review.

Can a value be copied from another generator?

No. Use the selected equipment and project design basis.

Who signs off the engineering?

Only the registered engineer responsible for the job.

Primary sources

  1. Application Manual: Liquid Cooled Generator Sets, ventilation chapterCummins
  2. Ambient Capability of Enclosed Generator SetsCaterpillar
  3. ISO 8528-10:2022, Measurement of airborne noiseInternational Organization for Standardization
  4. ISO 3744:2025, Determination of sound power levelsInternational Organization for Standardization