What should the working drawing record?

Illustrative example. Replace the prompts with approved project data and identify unresolved items for the responsible discipline.

Generator enclosure review matrix
TopicInput or evidenceReview owner
ChangeWhat changed and whyRevision note
InterfaceAffected discipline or supplierReview owner
EvidenceUpdated data or calculationSource register
IssueApproval and distribution statusDocument control

What does the source support?

Changes to air paths can affect restriction, heating and ambient capability. Caterpillar's guidance is a reminder to recheck the system when enclosure geometry changes.

Sources: Caterpillar: Ambient Capability of Enclosed Generator Sets

What remains an engineering decision?

Cooling, acoustic, structural, fire, fuel and electrical compliance require qualified project review. Only the registered engineer responsible for the job performs engineering sign-off.

Common questions

What else should the bid team know?

Does this guide approve an enclosure design?

No. It is a coordination framework for approved inputs and specialist review.

Can a value be copied from another generator?

No. Use the selected equipment and project design basis.

Who signs off the engineering?

Only the registered engineer responsible for the job.

Primary sources

  1. Application Manual: Liquid Cooled Generator Sets, ventilation chapterCummins
  2. Ambient Capability of Enclosed Generator SetsCaterpillar
  3. ISO 8528-10:2022, Measurement of airborne noiseInternational Organization for Standardization
  4. ISO 3744:2025, Determination of sound power levelsInternational Organization for Standardization