What should the working drawing record?

Illustrative example. Replace the prompts with approved project data and identify unresolved items for the responsible discipline.

Generator enclosure review matrix
TopicInput or evidenceReview owner
OutletEngine and flexible connectionVendor outline
RoutePipe geometry and support pointsMechanical design
PenetrationSleeve, seal and clearanceEnclosure detail
DischargeTermination and safe locationProject design

What does the source support?

The manufacturer application data should control the selected set's exhaust arrangement. Do not transfer a route or allowable condition from another model.

Sources: Cummins: Application Manual: Liquid Cooled Generator Sets, ventilation chapter

What remains an engineering decision?

Cooling, acoustic, structural, fire, fuel and electrical compliance require qualified project review. Only the registered engineer responsible for the job performs engineering sign-off.

Common questions

What else should the bid team know?

Does this guide approve an enclosure design?

No. It is a coordination framework for approved inputs and specialist review.

Can a value be copied from another generator?

No. Use the selected equipment and project design basis.

Who signs off the engineering?

Only the registered engineer responsible for the job.

Primary sources

  1. Application Manual: Liquid Cooled Generator Sets, ventilation chapterCummins
  2. Ambient Capability of Enclosed Generator SetsCaterpillar
  3. ISO 8528-10:2022, Measurement of airborne noiseInternational Organization for Standardization
  4. ISO 3744:2025, Determination of sound power levelsInternational Organization for Standardization